Marshalltown ConcreteMarshalltown Concrete

Concrete footings in Marshalltown IA - a solid base matched to what it carries

Planning an addition or garage and need footings? We match each one to its load and plan the inspection and weather around it.

Concrete pool deck with geometric pavers, pale coping and a built-in stone bar beside a swimming pool.
  • Fully licensed and insured.
  • Free quotes on site.
  • We reply within 1 business day.

What a footing does under your build

Concrete footings are the wider concrete base under a foundation, and in Marshalltown we pour them to spread the weight of a wall or column out into the soil, so whatever you build on top has firm ground under it.

You're usually calling because something new is going up and the footings have to go in before anything else can. The price moves with how many footings there are, how much digging and steel each one needs, how easy the site is to reach and whether the ground has to be thawed first. The schedule turns on the permit, the footing inspection and the weather, so we check what the city needs before we set a date, and when a permit or inspection is part of the job, we handle the paperwork. We're based in Marshalltown and work in Newton, Grinnell, Nevada and the cities around them, and I'll walk your site and write up your own numbers at the estimate.

  • A plan you can follow

    From the first visit you'll know the order of the work, the permit, the dig, the inspection and the pour, and what each step is waiting on.

  • Pour dates we won't rush

    If the ground isn't ready or the inspection hasn't happened, I'll move the pour and tell you right away, because concrete is hard to undo once it sets.

  • The owner on site

    I come out to look at the job and write the estimate myself, and I lead the small crew that does the work, so the person who planned it is there for the pour.

How we lay out and pour footings

First I sort out what each footing holds, a full wall or a single pier, because that decides how each one is shaped and laid out. Then we mark the layout, dig down to firm soil and clean out the loose dirt, so the footing sits on solid ground instead of fill. We set the forms and the rebar, the steel bars inside the concrete that help it hold together under load, and call in the footing inspection before any concrete goes in. Once the inspector signs off, we pour and keep the footings covered while they cure, which is the time the concrete needs to gain strength before walls or posts go on top. In cold weather we plan the pour date around the ground being ready rather than the calendar.

Footings often come up alongside other work. If an older wall or slab on your property has already sunk, foundation raising lifts it back toward level, and when a new footing has to go in under or beside existing concrete, concrete cutting gives us a clean opening without breaking up more than we need to.

What footings usually hold up

Walls for a home addition

An addition's walls need footings that line up with the existing house, so the new rooms sit on the same kind of firm base as the rest of your home.

Detached garages and shops

A detached garage or workshop needs footings under its walls before the floor goes in, and getting them square and level makes every step after them easier for the framers.

Porch posts and columns

A post or column puts all its weight on one spot, so the footing under it has to land exactly where the post goes and be checked before anything is built on top.

Builder and business projects

Builders and business owners call us for footings on new buildings, and we work from their plans and dates so the footings are poured and inspected before the next crew arrives.

Get a footing estimate for your project

Send the form and we'll reply within one business day to set up a visit. I'll come out, look at the site and write up a free estimate, with no obligation to go ahead.

  • What you're building and how big

    Tell us the project type and its rough size, whether it's an addition, a garage or a new building, so I come out with a sense of the layout and the footings it needs.

  • Whether it carries a wall or a pier

    Let us know if the footings hold up full walls, single piers or both, because that decides the footing type and much of the digging and concrete.

  • The season you plan to build

    Tell us when you'd like to pour, since a winter job may need the ground thawed and the fresh concrete covered, and that changes the schedule.

(641) 354-2469

Questions about footings in Marshalltown

Here's what people ask before they put footings in, from picking a type to permits, inspections, winter pours and contractor registration.

What's the difference between a continuous footing and a pad footing?

A continuous footing runs the entire length of a foundation under a wall, while a pad footing sits under one concentrated load, like a pier or column. The choice follows what the footing carries, so a full wall gets a continuous footing and a single pier gets a pad. Some projects need both, and I sort that out before we dig.

Do I need a building permit for footings in Marshalltown?

If the footings are for new construction, an addition, an alteration or an accessory building like a garage, Marshalltown typically requires a building permit. Work can start only after the permit is issued, the plans are approved and the fees are paid, as the city's building permit steps lay out. When you hire a contractor, the contractor gets and signs the permit, and we handle that for you.

Does Marshalltown inspect concrete footings before they're poured?

Yes, the city typically requires inspections for footings, foundation walls and under-slab plumbing, and each one needs 24 hours' notice. That notice is why we line up the footing inspection before we set a pour date, so the trench is open and ready when the inspector comes. The city works from the International Residential Code and the International Building Code.

Can concrete footings be poured in winter in Iowa?

Yes, with extra steps. A Michigan concrete group's cold weather guide says to pour only on unfrozen ground that's at least 40°F and within 20°F of the concrete, thawing it with heaters or blankets if needed. The same guide says to cover fresh concrete right away and keep it at 50°F or above for at least 3 days. So I plan the pour around the ground.

Can frost heave damage footings on clay soil?

It can. Extension guidance from North Dakota explains that frost heave lifts soil when ice layers form near the water table, and it can lift and damage foundations, basement floors and walls. It's more likely with a high water table and clay or silt soil, so on wet, heavy ground I look closely at the soil and drainage before we pour.

Does a concrete contractor have to be registered in Iowa?

Yes, Iowa's rules say a contractor has to be registered with the state before doing construction work there, and Marshalltown advises checking that a contractor is state licensed and carries a certificate of insurance. We're fully licensed and insured. The registration rules leave out a person working on their own property, and the city lets an owner apply for a permit as owner/builder.

Get your footings on the calendar

Call (641) 354-2469 or send the form early, since the permit, inspection and weather all need to line up before a pour date.

(641) 354-2469Request an estimate